Two hooded button-front shirts shown from the front: one charcoal and one ivory, each with chest pockets.
Close-up of an ivory hooded shirt showing the hood, drawcords, collar, and top button of the placket.
Close-up of an ivory shirt sleeve and cuff with two buttons and a buttoned sleeve placket.
Close-up of softly textured, subtly mottled ivory shirt fabric draped in folds.
Black-gray hooded button-up shirt-jacket flat lay with chest patch pocket, lower pocket and drawcord hood
Off-white hooded button-up shirt-jacket flat lay with patch pockets, button cuffs and drawcord hood
Back view of a charcoal hooded shirt with long sleeves, button cuffs, and a curved hem.
Back view of an ivory hooded shirt with long sleeves, button cuffs, and a curved hem.
Upper front of an off-white hooded button-up shirt, showing the hood, drawcords, and top button.
Close-up of the shirt's hood drawcords threaded through metal eyelets.
Close-up of the off-white shirt's chest pocket, stitching, and front buttons.
Close-up of the shirt's buttoned sleeve cuff and curved hem.
Lower front of the off-white shirt, showing its curved hem, placket, and chest pocket.
Close-up of the shirt's curved hem seam and side construction.
Close-up of the back of an off-white hooded jacket, showing the hood, shoulder seams, and pleated back panel.
Close-up of softly textured off-white fabric arranged in folds.

Recently viewed

You haven't viewed any products yet.